The replacement eastern span of the San Francisco–Oakland Bay Bridge opened on 2 September 2013. Its certified combined transverse deck width, including the gap between parallel decks, is 78.740 m.
JiLuDB /
Largest Measured and Indicated Lithium Resource at a Single Deposit