Skip to main content
JiLuDB
ExploreAll recordsTimelinePlacesMapAbout
Search records, people, places…
Public site
LANG
ExploreAll recordsTimelinePlacesMapAbout
JiLuDB

Explore the World's Records

GLOBAL RECORDS DATABASE

HomeAll recordsTimelinePlacesAbout

© 2026 JiLuDB. All rights reserved.

Previous recordFirst record reached
Next recordLongest-span Pedestrian Suspension Bridge
←→ Browse1 / 534Back to list
Immersive view

Record #00538Architecture archive

Tallest Structurally Topped-out Hybrid Mass-timber Tower

Atlassian Central in Sydney marked structural topping-out on 22 July 2026 at over 180 m; the tall-building database lists an architectural height of 182.6 m. It is identified as the tallest topped-out hybrid mass-timber tower, while completion and occupancy have not been confirmed.

Verification status
View verification details ↗
Last updated
2026-11-23
Category index

Current Record

182.6m

Previous recordFirst record reached
Next recordLongest-span Pedestrian Suspension Bridge
Back to list
Previous recordFirst record reached
Next recordLongest-span Pedestrian Suspension Bridge

Current record value

Holder
Atlassian Central
Location
Atlassian Central tower site · Sydney · New South Wales · Australia
Start date
2026-07-22
Record status
Evidence-backedView verification details ↗Report an issue
OverviewRecord historyRelated recordsSources

Overview

Archive Note

Near Sydney Central Station, the tower uses engineered timber together with steel and concrete, incorporating multi-storey timber office modules and a glazed façade.

The July 2026 topping-out ceremony marked level 39 of the structural works, while the tall-building database lists 42 floors under a different counting convention. The project's November 2026 updates still schedule crane removal and reinstatement works, so a planned completion date cannot be treated as confirmed handover.

Key information

Architectural height
182.6 m, tall-building database
Topping-out ceremony
22 July 2026
Developer's height
Over 180 m
Floor-count conventions
39th structural level; database lists 42 floors
November 2026 update
Construction and tower-crane removal works still scheduled

Record history

1 Milestones
  1. 2026-07-22182.6 mAtlassian CentralAtlassian Central tower siteCurrent Record

Related records

Continue Exploring
01

Architecture · #00022

World's Longest Bridge

Verified

164.851 km

Danyang-Kunshan Grand Bridge

02

Architecture · #00206

World's Tallest All-Timber Building

Verified

85.4 metres

Mjøstårnet

03

Architecture · #00210

Some of the World's Oldest Surviving Wooden Buildings

Verified

late 7th to early 8th century

Buddhist Monuments in the Horyu-ji Area

Sources

Evidence & References

Verification basis and limitations

Evidence-backed

Credible sources support core facts; the comparison scope or corroboration remains incomplete.

Basis: direct confirmation by an authority

Dexus and BVN confirm the July 2026 topping-out and tallest hybrid-timber claim. The tall-building database reports 182.6 m and 42 floors with an architecturally topped-out status. The project's November 2026 update still lists works, so practical completion has not been assumed. Different structural-floor and database floor counts are disclosed.

Ranking confidence
Uncertain

Comparison boundaries still under review

Comparison is limited to structurally topped-out hybrid timber towers, not all planned or completed-only buildings. The 182.6 m architectural height is database-reported; the developer states over 180 m. November works do not prove final handover.

Verification assessment
2026-11-23
Last editorial review
2026-11-23

Current Entry identifies the current entry in this archive; it does not establish that the record is still held today.

Source IDSourcePublisherLink
SRC-001Atlassian Central: November 2026 Construction WorksOfficialENRecord topicAtlassian Central project teamSRC-002Atlassian Central — The Skyscraper CenterDatabaseENCurrent recordCouncil on Vertical Urbanism / CTBUH tall-building databaseSRC-003World's tallest hybrid timber tower reaches full height in SydneyOfficialENCurrent recordBVNSRC-004Atlassian Central: Building the world's tallest hybrid timber towerOfficialENCurrent recordDexusSRC-005The Mass Timber DatabaseDatabaseENCurrent recordCTBUH

The record value on this page is organized from the public sources above. Measurement methods may differ; JiLuDB follows the unified method described for each entry.

Public feedbackFound a data issue?If a fact has changed, the data is incorrect, or you know a more authoritative source, submit feedback.Submit feedback

Help keep the archive accurate

If a fact has changed, a value is incorrect, or you know a more authoritative source, leave a note. Feedback enters an administrator review workflow and never edits a record directly.

Evidence-backed
Architecture

ARCHIVE VISUAL / 01

NOT TO SCALE

  1. Home
  2. /All records
  3. /Tallest Structurally Topped-out Hybrid Mass-timber Tower

Recording humanity Understanding the world / GLOBAL RECORDS DATABASE